Batch B-2024-084

HDPE Containers

B-2024-084COMPLETE

TRACEABILITY SCORE

0%Complete
Collection stage100%
Sorting stage100%
Processing stage100%
Granulation stage0% — not logged
Dispatch stage0% — not logged
Material

HDPE Containers

Vendor

UrbanRecycle Ltd

Started

Mar 8

Total Input

900 kg

Chain of Custody

UrbanRecycle Ltd

Collection source

Mar 18, 09:00

Weighbridge verified

Mumbai Central Depot

Aggregation point

Mar 18, 10:30

QC scan: PASS

Aperio Facility

Processing site

Mar 18, 14:00

Shredder #3

Batch Timeline

COLLECTION

Mar 18, 09:00 AM
Input: 4,200 kg

Location: Mumbai Central Depot

Method: Manual collection + weighbridge

Status:Complete
800 kg loss (19.0%)

SORTING

Mar 18, 02:00 PM
Input: 4,200 kgOutput: 3,400 kg
Loss: 800 kg (19.0%)

Location: Processing Facility A

Method: Automated optical sorting

Contaminants removed: caps, labels, foil

Status:Complete
1,155 kg loss (34.0%)

PROCESSING

Mar 19, 10:00 AM
Input: 3,400 kgOutput: 2,245 kg
Loss: 1,155 kg (34.0%)ANOMALY

Location: Processing Facility A

Method: Shredding + washing

Shredder efficiency below normal

Status:Anomaly Detected

GRANULATION

In Progress...
Estimated start: Mar 20

DISPATCH

Pending
Awaiting data entry...

Loss Analysis

Summary

Total Input900 kg
Total Output810 kg
Total Loss90 kg
Recovery Rate90.0%
Completeness100%

Loss Analysis — Plain English

You started with 900 kg of PET bottles.

Sorting removed 800 kg (19%) — caps, labels, and non-PET contamination. This is NORMAL.

Processing lost 1,155 kg (34%) — this is HIGH.

The industry average is 15–20%. Possible causes: shredder wear, wet input, or material contamination.

Final output so far: 2,245 kg recovered (still 2 stages to go)

Overall efficiency so far:249.4%

Batch Intelligence Report

AI-generated analysis

Batch B-2024-084 shows strong collection and sorting performance. However, the processing stage recorded a loss of 34.0% — significantly above the 20% anomaly threshold. This may indicate mechanical inefficiency in the shredding unit or a higher-than-usual contamination load in the input material. Data completeness is currently 100% — the granulation and dispatch stages still require logging. Recommend: (1) Review shredder calibration logs, (2) Complete remaining stage entries, (3) Cross-check with vendor delivery note.